Details:
Application
Uses accelerated means of estimating delayed expansion of Portland cement caused by hydration of CaO and MgO. Test bars are exposed to controlled steam pressure and corresponding constant temperature Specification:
1. Effective capacity: 3L
2. Heating time controlling:3 hours
3. 2 Heating elements: 1KW and 3KW, make sure that the water reaches boiling point within approx. 30 minutes, after which a timer cuts out the more powerful element so that the task of maintaining the water temperature is left to the second heating element.
4. Power: AC220V, 50HZ, single phase
Structure:
Double wall with stainless steel tank inside and rack. |